Edge mesh for arrays
Solar Panel Critter Guard in Hazel Crest, IL
Mesh run along the outer edge of your array, sealing off the shaded gap underneath without any holes drilled through the modules.
What Collects in the Shade Beneath Your Modules
Rooftop modules sit a short distance above the shingles, and the shaded pocket between them stays dry, out of the wind and out of reach of hawks, which is precisely why pigeons build there and squirrels treat it as a den. Left alone, the pocket fills with twigs, droppings and blown leaves that hold dampness against the roof, and a curious squirrel can chew through exposed wiring while it is at it. Edge mesh, usually called critter guard, seals the pocket off. It is a mesh strip run along the entire outer edge of the array and secured by clips, which means no module is ever drilled. Solar Panel Removal Hazel Crest fits it as a job of its own or as the closing item of a take-down and rebuild, and the second option is especially tidy, since the array is already open and every inch underneath can be reached. Where birds have moved in, the nests, droppings and leaves are cleared out completely before any mesh goes on, so nothing gets sealed inside. Pigeons account for most of the calls we receive about it in Hazel Crest, though the method holds for any animal: empty the pocket fully, seal the edge all the way round and keep it sealed.
Line Items on an Edge Mesh Job
A modest job, approached with the same care as a full rebuild.
Edge survey
The whole outer edge checked for openings and signs of nesting.
Pocket cleanout
Twigs, droppings and leaves removed before the mesh is fitted.
Clip fastening
Mesh held by clips, so not one hole is drilled through a module.
Closed corners and joins
Each corner and join fitted tightly so there is no way back underneath.
Added during a rebuild
Fitted as the final line of a take-down and rebuild while everything is open.
How the Edge Mesh Is Fitted
Describe the signs
Tell us the signs you have spotted and an approximate module count, and an itemized price follows by phone, usually within 48 hours.
Empty the pocket
On the booked day, everything that has gathered beneath the edge is cleared away.
Seal the edge
Mesh is clipped along the entire outer edge with each corner and join closed.
Why Homeowners Leave the Edge Mesh to Us
Modules left undrilled
Clips carry the mesh, so the modules stay exactly as they were built.
Emptied before sealing
Nothing old is left trapped behind the mesh.
Tidy during a rebuild
When the array is already coming down for a reroof, the mesh goes on during the same visit.
- Clip fastened
- Pocket emptied
- Entire edge
- No drilling
Pigeons Nesting in the Shade of Your Array?
Describe what you have noticed and how many modules you have, and we will itemize the edge mesh and book a date.